Design, supply of all electro mechanical material, supervision on the construction activities of the transmission lines 66 kV, from substation Sodo of EEPCO, to the main store SALINI S.p.A., named GIBE III, total length 60 km.
Work Period: 2012
Design, supply of all electro mechanical material, supervision on the construction activities of the transmission lines 66 kV, from substation Sodo of EEPCO, to the main store SALINI S.p.A., named GIBE III, total length 60 km.