DESIGN, SUPPLY MATERIALS, SUPERVISION OF TRANSMISSION LINE 66 KV – ETHIOPIA

Design, supply of all electro mechanical material, supervision on the construction activities of the transmission lines 66 kV, from substation Sodo of EEPCO, to the main store SALINI S.p.A., named GIBE III, total length 60 km.

Work Period: 2012