CONSTRUCTION OF NEW 132 KV LINE MILAN – BOLOGNA

Construction of 132 kV primary line at D.T. to connect S.S.E. TAV in Beneceto and pole 106, of the by-pass connection S.T. to S.S.E. in Villa Cadè, of the entry at S.S.E. of Rubiera in S.T., demolition of the existing historical line Fidenza – Rubiera. Execution of work for the laying of AT interred cable at 132 kV D.T., realization of civil work for the cableduct of Reggio Emilia.

Work Period: 2005-2009