Construction of the route, from support 1 end of line in S. Fiorano to support 54, of the power line at 380 kV S. Fiorano – Robbia, realisation of foundations, assembly of supports and stretching of conductors.
Work Period: 2004
Construction of the route, from support 1 end of line in S. Fiorano to support 54, of the power line at 380 kV S. Fiorano – Robbia, realisation of foundations, assembly of supports and stretching of conductors.
Work Period: 2004